Vessel fabricates custom pressure-retaining equipment for the most demanding services in the petrochemical, water treatment, food processing, and pharmaceutical industries. Every vessel is engineered by our in-house team, fabricated in our 180,000 sq ft Houston shop, and delivered with a complete documentation package.
Atmospheric Storage Tanks
API 650 · Up to 500,000 gal
Pressure Vessels
ASME VIII Div. 1 & 2 · Up to 3,000 PSI
Process Containers
Custom internals · Agitated
Reactors & Exchangers
TEMA · ASME U-Stamp
Gulf Coast Refinery, TX
2024
Hydrogen sulfide service required full NACE MR0175 compliance with 100% RT and PWHT.
Fabricated with Cr-Mo alloy plate, 100% radiographic examination, and documented PWHT cycle logged to ASME Data Report.
City of Columbus, OH
2024
Potable water contact required NSF 61-certified interior coating applied in controlled conditions.
Shop-applied Tnemec Series 394 Perma-Glaze with holiday testing; field-erected with certified welders under CWI oversight.
Vessels Delivered
Since 1987 · Across 14 industries
Midwest Dairy Cooperative, WI
2024
Electropolished interior required weld seams ground flush with zero crevices per 3-A sanitary standard.
Full-penetration welds ground to Ra 32 µin, documented surface mapping provided with MTRs and passivation certs.
Eastman Chemical, TN
2023
Chloride-rich process fluid eliminated stainless steel; exotic alloy required specialized welding procedures and filler metals.
Qualified WPS per ASME IX using ERNiCrMo-4 filler; third-party PMI performed on all welds and base metal.
PSI Maximum Working Pressure
Standard scope · Higher pressures on inquiry
Permian Basin Operator, NM
2023
Fast-track schedule required vessel on-site in 8 weeks from PO with no compromise to ASME certification.
Parallel-path fabrication: material procurement, WPS qualification, and shop routing executed concurrently; delivered in 7.5 weeks.
Bechtel — LNG Facility, LA
2023
Div. 2 design-by-analysis required finite element analysis submittal and Owner-appointed AI acceptance during fabrication.
FEA package prepared per ASME PTB-1; AI witness present for all critical NDE; U2 data report submitted to National Board.
Weeks Average Lead Time
From purchase order to delivery
Fabrication Process — From PO to Delivery
Engineering Review
P&ID review, stress analysis, material selection per ASME/API code
Material Procurement
Mill-certified plate, full MTRs, third-party material verification
Fabrication
CNC plate rolling, SAW/SMAW/GTAW welding, PWHT as required
NDE & Inspection
RT, UT, MT, PT per ASME code — third-party AI/AIA witness
Delivery
Hydrostatic test, surface prep, final inspection, logistics coordination
Vessel's capability statement is the document procurement teams attach to their approved vendor lists. Download it now, or send it directly to your engineering manager.
Our estimating engineers respond within one business day. Bring your P&ID, your spec sheet, or just a napkin sketch — we've worked from all three.
Houston, TX · +1 (713) 555-0184 · Mon–Fri 7 AM–5 PM CST